Rose Rent Lofts breathes new life into Chambersburg’s historic 1909 school, transforming a long-vacant landmark into 31 distinctive residences. Thoughtful rehabilitation reveals the building’s original character, pairing exposed stone walls, restored wood floors, and historic details with the comforts of contemporary living. Rooted in nearly two centuries of community history, the project preserves a meaningful connection to the past while bringing renewed vitality to its neighborhood and welcoming a new generation through its doors.
Client: McKissick Properties
Location: Chambersburg, PA
Building area
47,500 SF
Renovated
46,000 SF
New construction
1,500 SF
Demolished
35,000 SF

The Charge

Our objective was to breathe new life into a long-underutilized landmark, balancing thoughtful preservation with contemporary living and ensuring that a meaningful piece of Chambersburg’s history would endure for generations. Transforming the 1909 school into market-rate residences offered an opportunity to connect the community’s affection for Old Central with a demonstrated need for housing. To succeed, that vision also needed a practical foundation: a development that could sustain itself through private investment.

Our involvement began in 2007, when McKissick Associates worked with a developer exploring residential conversion. The proposal stalled during the 2008 financial crisis, and subsequent concepts encountered difficulties securing approvals and financing. As years passed and the building’s future remained uncertain, the Chambersburg Area Development Authority brought the question back to our team: “What would you do?”

The answer began with understanding both the property and the people it could serve. Market research, informed by national consulting firm Novogradac, identified demand for market-rate housing. Relocating professionals and established households sought distinctive accommodations near downtown, with the flexibility and convenience of rental living.

Our charge was to bring those needs into alignment with the building’s architectural strengths. Through a feasible plan for preservation and reuse, we sought to create homes that offered modern comfort while allowing residents to become part of a much longer community story.

The Challenges

Giving Old Central a new purpose required confronting the same conditions that had limited its life as a school. The tightly developed site left inadequate space for parking, emergency access, and accessible circulation. Previous proposals sought to fit substantial residential density within the existing complex, but the amount of building area made these fundamental site constraints difficult to resolve. A successful future depended on creating room for the property to function.

That realization introduced some of the project’s most consequential preservation decisions. Later additions wrapped around the 1909 school, concealing its architecture and connecting it to the adjoining school structure. Determining which portions to retain and which to remove required careful consideration of historic character, physical condition, and long-term usefulness. Selective demolition would need to protect the surviving construction while allowing reusable materials to be recovered and preserved.

Inside, spaces shaped around classrooms and school-day routines needed to become comfortable residences. The design had to work within the existing structure while accommodating residential layouts, modern building systems, and accessibility needs. Each intervention required a balance between the qualities that made the building worth saving and the changes necessary to support daily life.

Financial feasibility remained essential throughout. With private funding supporting the project, restoration costs and operating efficiency had to align with the local rental market. The challenge was to develop a sustainable residential community that respected its neighborhood while giving a deeply valued landmark a lasting future.

The Solutions

Our design approach centered on revealing the building’s historic identity and allowing its original architecture to become the foundation for a new way of living. Selective demolition removed incompatible additions and connecting wings, restoring the prominence of the 1909 school and opening the center of the block. The space recovered through this process made room for parking, accessible circulation, emergency access, and new utilities. Separating the two principal buildings also allowed each to be developed and financed independently, establishing a practical path forward for the property.

Historic drawings and photographs guided the restoration of the 1909 façade, helping recover details obscured by decades of change. Replacement windows reproduced the original proportions and patterns, while brick staining reconciled areas altered by later construction. Above suspended ceilings, leaded-glass transoms emerged from concealment and were carefully restored, returning a distinctive element of the school’s craftsmanship to view.

Within the building, sensitive rehabilitation brought contemporary residential amenities and building systems into spaces that retained their historic character. The academy’s three-foot-thick stone walls became defining features of the common areas, connecting residents directly to the property’s earliest surviving construction. Original wood floors were restored with salvaged materials used for repairs, and reused interior transoms carried natural light into interior rooms. Ceilings ranging from 15 to 22 feet created opportunities to insert lofts, adding approximately 3,400 square feet within the existing building.

The school’s smaller reminders of community life also found a place in its renewal. Restored auditorium seats became furnishings along residential corridors, while chalkboards were carefully salvaged, including examples that still held their final written messages. These familiar objects preserved a human connection to the generations who had passed through the school.

Alongside this restoration, high-efficiency heat pumps, LED lighting throughout, and substantial insulation improvements supported efficient operation. Accessible entrances and controlled-access features helped make the property welcoming and convenient for residential use. Together, these interventions allowed the building to accommodate contemporary life while retaining the details and craftsmanship that make it distinctive.

The Outcomes

After decades of vacancy, the former 1909 school welcomed people through its doors once again, this time as residents returning home. Rose Rent Lofts created 31 market-rate apartments, all leased within the first six months of opening. The completed project encompasses approximately 43,193 square feet, including new loft areas inserted within the building’s generous interior volumes. A $7.7 million investment, completed without public funding, established a viable future for a property that had long awaited its next purpose.

The benefits of rehabilitation extended beyond the building’s renewed appearance. Extensive salvage and reuse preserved existing materials and the craftsmanship they embodied. Improvements to insulation, lighting, and mechanical systems supported reported annual energy costs of approximately $0.55 to $0.65 per square foot in the project’s 2021 documentation, pairing historic character with efficient operation.

For residents, the building’s history is part of everyday life. Exposed stone walls, restored wood floors, leaded glass, and salvaged school furnishings connect contemporary homes to the generations who learned and gathered here. Nearby restaurants, shops, and activities place those homes within the daily life of downtown Chambersburg.

Once an underutilized institutional property, Rose Rent Lofts now contributes renewed vitality to its neighborhood, preserving an important community landmark and demonstrating the enduring architectural, cultural, and environmental value of adaptive reuse. Its transformation allows a meaningful piece of Chambersburg’s history to remain active, useful, and cherished for generations to come.

Before We Began

When redevelopment efforts began, Old Central’s architectural character lay beneath decades of additions and alterations. Later construction had wrapped around the original 1909 school, enclosing portions of its exterior and obscuring or removing façade details. Buildings occupied nearly the entire block, leaving little space for parking, safe circulation, emergency access, or accessible entrances. The school that had expanded to serve its community had gradually outgrown the capacity of its site.

Years of disuse and deterioration had also taken their toll. Environmental remediation and stabilization were needed, along with substantial improvements to prepare the property for residential life. Inside, suspended ceilings concealed historic leaded-glass windows, while successive alterations made the original proportions and craftsmanship difficult to appreciate.

Despite these conditions, the building retained the qualities that would give its next chapter meaning. The academy’s substantial stone walls remained at its core. Original wood floors, generous windows, and ceilings rising from 15 to 22 feet offered the foundations for distinctive homes. The opportunity was to uncover those assets, restore their presence, and reshape the surrounding site so that the building could once again welcome people safely and comfortably.

The Story

The story of Rose Rent Lofts is closely woven into the history of Chambersburg, Pennsylvania. Its name recalls a tradition established by town founder Col. Benjamin Chambers, who set aside land for churches and schools in exchange for an annual “rent” of one rose paid to the Chambers family. That gesture of community investment established a fitting legacy for a property that would educate generations of students before welcoming residents home.

The site’s educational beginnings trace to a Latin academy. In 1826, the academy constructed a substantial building with three-foot-thick stone walls, creating the enduring core that survives within the property today. Boarding students arrived by train near the school, bringing young people into a growing center of learning. In 1836, the building’s basement also became home to Chambersburg’s first public school, with separate rooms for boys and girls.

The Confederate burning of Chambersburg in 1864 devastated the school along with much of the town. Yet its heavy stone walls remained standing. When the school was rebuilt within them in 1867, those walls became a physical connection between the community’s loss and its determination to rebuild. They would endure through each subsequent transformation, preserving evidence of the town’s past within the fabric of the building.

In 1909, the community commissioned a replacement school with the express intention of retaining an “architect of distinction.” Harrisburg architect Miller Kast incorporated the surviving academy walls into his design, giving the school a renewed architectural presence while preserving its historic core. For generations of students, teachers, and families, the building became a familiar setting for daily routines, shared milestones, and lasting memories.

As enrollment grew, a major expansion by Lawrie & Green Architects introduced an auditorium, gymnasium, and additional classrooms. A cafeteria and auxiliary gymnasium followed in the late 1950s and early 1960s, gradually filling nearly the entire site. At one point, the school operated in double sessions to accommodate its students. Each addition answered an immediate need, but together they increasingly enclosed the 1909 building and concealed portions of its original exterior.

By the 1970s, restrictions affecting multistory, wood-framed school buildings had prevented use of the oldest building’s third floor. Limited site access and the absence of room for further expansion added to the difficulties of continued operation. Central Junior High School closed in 1986, and the complex sold at public auction for $130,260 after receiving only two bids.

For decades afterward, Old Central stood largely unused, even as its place in the community’s memory endured. McKissick Associates began exploring redevelopment with prospective developers in 2007, but the financial crisis and subsequent difficulties securing approvals and financing delayed progress. McKissick Properties’ acquisition of the property in 2014 marked a turning point, beginning the next chapter in its evolution from a cherished school to Rose Rent Lofts.

Once upon a time, there was a school...

Every year she looked forward to fall; the crescendo of voices, of old friends and new.
She was never alone... and she was happy.
Would you like to know the rest of the story?

Gallery

Brief History of the old Chambersburg Central High School

Chambersburg was founded by Ben Chambers who, early on, set aside land for churches and schools that would have their land as long as their use continued for the cost of 1 rose paid on the last Sunday in June to the last surviving relative of Ben Chambers. "Rose Rent Sunday" is still observed by several churches in Chambersburg. Chambersburg Central High School is no longer a rose rent property, but we named the 1909 apartment restoration project "Rose Rent Lofts" in honor of the tradition of the town.
1798: On the steps of the Latin Academy
First school built on the grounds under Ben Chambers’ “Rose Rent” Charter
The first school established was a Boys’ Latin Academy, housed initially in a wood and brick structure.
1826: Recitation Hall
Also on the site is a dormitory for boarding school students
Most students arrive by train which stops at the station one block away and continues past the school under an iron bridge that crossed 3rd Street at Burkhart Avenue.
1826-1864: The stone Academy
Academy constructs instructional building with 3’ thick stone walls
This building was burned to the ground along with most of the town on July 19.
1909: The Miller Kast structure
Public School Bonds fund a new school with directive to engage an “architect of distinction”
At the core of the design by Miller Kast, you can still see the center form of the 3-story stone structure. The stone walls which still bare scarring from the burning of Chambersburg form the shell for the quickly rebuilt school.

1929: An Addition facing Queen Street
New addition constructed with auditorium, gymnasium and classrooms
This addition by the firm of Lawrie & Green Architects more than doubles the size of the high school. As population grows, the school is “double-sessioned”.
1986: The old school closes and remains abandoned for 30 years
Additions fill the remaining site in 1958 and 1962
The school is converted to a Junior high in the 1950s. Several additions for a cafeteria and auxiliary gymnasium are constructed which completely fill all open ground on the site. With the site inaccessible for safety and no expansion possible, the school closes and is sold at public auction.

2020: The 1909 portion is restored and reopens as "Rose Rent Lofts"
A number of options and plans are explored
McKissick Properties acquires “Old Central” and the two primary structures from 1909 and 1929 are separated with selective demolition of the later additions. 31 market-rate apartments are fully leased within the first 6 months of opening.

Time Lapse

Renderings from Above: Burkhart & Harrison
BeforeAfter

To create emergency vehicle access and parking, the connecting wings of the 1930 additions and the 1950s & 60s infill are removed.

Renderings from Above: Queen & South 3rd Streets
BeforeAfter

To create emergency vehicle access and parking, the connecting wings of the 1930 additions and the 1950s & 60s infill are removed.

Video